Flexible Full rack up to 30kW, 52U 19" or 24"
Located in CLT-1 Data Center (1035 Mecklenburg Hwy, Mooresville, NC, USA)
SpaceFull cabinets (1+)
Product power30 kW
Power circuit60A/208 AC
Speed100 Mbps
IPs/31 (2 usable)
Term3 years
Price
Sale ends on Apr 2
Start an RFP and get a proposal for your custom requirements
* No payment required.

GIGA Data Centers Flexible Full rack up to 30kW, 52U 19" or 24"

Don't run out of rack space again! Our 52U rack includes rackmounted PDU's (36x C13 and 6x C19), power whips and metered bus plug as standard. Need to use hyperconverged systems from Nutanix or Pivot3, or HPC configurations using AI and Machine Learning? We can support that including and guarantee that our SLA delivers to ASHRAE TC9.9's recommended guidelines, including a PUE that will be 1.15 - guaranteed. Have a standard configuration that isn't high power? You'll still save money with our low PUE, low cost of Power at 4.1₵ per kWhr., and metered power offering.
Turnkey 30kW Metered Power, 52U Rack
24-inch rack cabinet at 52U includes A+B PDU's (36 x C13 and 6x C19 outlets), power whips and metered bus plug. Pay just for the power consumed. 2N redundant power, N+1 on mechanical.
WindChill Action Video
Loading...

Data Center Specifications

Building Size: 165000.0 sqft
Colocation Space: 120000.0 sqft
Total Power: 60.0 kVa
Power Density:

Data Center Certifications

HIPAA:Ok
PCI DSS:Ok
SOC 2:Ok
SSAE 16 Type 1:Ok