$850 Full 3kW Cabinet nearby Chicago (15% off deal)
Located in 800 E Business Ctr Chicago Data Center (800 E Business Center Dr, Mt Prospect, IL 60056, USA)
SpaceFull cabinets (1+)
Total power3 kW
Power circuit30A/120 AC
SpeedNot Included
IPsNot Included
Setup fee$0
Term3 years
$850/month
Sale ends on May 10
* No payment required. You have up to 10 days to finalize your reservation with the provider.

zColo $850 Full 3kW Cabinet nearby Chicago (15% off deal)

The Mount Prospect facility is a premier site with ample space and power density in close proximity to Chicago O’Hare. The facility provides carrier-neutral connectivity to six carriers and is Cloudlink enabled.
Standard Locking Cabinet
120V/30A, Power Feed Redundancy, Options for connectivity to carriers within data centers

Data Center Specifications

Building Size: 81600 sqft
Colocation Space: 28000 sqft
Total Power: 4 kVa
Power Density: 0

Data Center Certifications

PCI-DSS:Ok
SSAE 16 Type 2:Ok

Other zColo Products