logo

1547 Critical Systems Realty: MTC (Midway Technology Center)

Facility Details40 E Garfield Blvd, Chicago, IL, USA
Phone
+1 844-403-9300
Building
230000 Sqfttotal space
Colocation
52000 Sqftcolocation space
Power
5 Mw total power
Products
0products
Airplane
19.27mi to the nearest airport

1547 Critical Systems Realty: MTC (Midway Technology Center)

1547 Critical Systems Realty MTC (Midway Technology Center) is located at 40 E Garfield Blvd, Chicago, IL, USA. The data center is 230000 sqft. There is a total of 52000 sqft in raised floor space for colocation. It has access to 5 MW of power. We found 87 data center locations within 50 miles of this facility. No certifications are specified for this location.

Chicago is one of the top 5 data center markets in the United States. With access to international financial exchanges, the city is situated in a fiber-rich, increasingly large cloud ecosystem and offers reliable power. Our Chicago colocation and data center facility has readily available access to trans-continental fiber networks.

Midway Technology Center (“MTC”), Chicago’s historic Schulze Baking Company building, is a 230,000 SF hardened warehouse – a National Register of Historic Places building and will address the strong demand in the Chicago data center market.

The building will be converted into a Tier III data center with over 50,000 square feet of high-power density raised floor space planned for Phase I.    

- Phase I - will comprise 50,000 SF upon completion- Phase II  - will add 120,000 SF and 26 MWs of total utility power. 




Powered by Froala Editor

TAX INCENTIVES
Enterprise Zone - no state sales tax & no tax on utility power Additional incentives available include: Historic Tax Credits, City of Chicago TIF funds & New Market Tax Credits
FACILITIES
23,000 SF building 52,000 SF of raised-floor space Access to 350 E. Cermak, 427 S. LaSalle, 600 S. Federal Latency to 350 E. Cermak .075 microseconds
POWER
CAPACITY: 5MW total AVAILABLE: 16 MW for future expansion 3 12,470V-circuits originate at the Washington Park substation from 3 separate buses Configured 2N, 1,350 kW or 2,700 kW aggregated
DEVELOPMENT PLANS
Currently under development, Phase i: will comprise 50,000 SF upon completion Phase II: will add 120,000 SF and 26 MWs of total utility power
Certifications
Close
HIPAA
Close
HITECH
Close
PCI-DSS
Close
ISAE-3402
Close
SSAE-16 Type 1
Close
SOC 2 Type 2
Close
ISO 27001
Close
ISO 22301
Close
ISO 50001
Close
ISO 90001
Close
ISO 14001
Close
NIST Cloud
Close
FISMA
Close
DIACAP
Close
SOX
Close
FIPS-140
Close
EHNAC
Close
EU-US
Close
Privacy Shield
Close
SOC 1
Close
SOC 2
Close
SOC 3
Close
SOC 2 Type 1
Close
SSAE-16 Type 2
Close
FedRAMP
Close
SOC 1 Type 2
Close
NIST 800-53
Close
SSAE-18
Close
LEED
Facility Types
Ok
Internet Exchange
Close
Cloud Node
Ok
Colocation Facility
Ok
DRBC Site
;