logo

Cyxtera: ORD2 (Chicago) Elk Grove Village Data Center Campus

Facility Details2425 Busse Road, Elk Grove Village, IL, USA
Phone
+1 866-403-5001
Building
163747 Sqfttotal space
Colocation
163747 Sqftcolocation space
Power
17.6 Mw total power
Products
51products
Airplane
2.49mi to the nearest airport

Cyxtera: ORD2 (Chicago) Elk Grove Village Data Center Campus

Cyxtera ORD2 (Chicago) Elk Grove Village Data Center Campus is located at 2425 Busse Road, Elk Grove Village, IL, USA. The data center is 163747 sqft. There is a total of 163747 sqft in raised floor space for colocation. It has access to 17.6 MW of power. We found 100 data center locations within 50 miles of this facility. Certifications for this location include PCI-DSS, ISO 27001, NIST 800-53, SSAE-18, HIPAA, ISAE-3402, SOC 2 Type 2, SOC 1, SOC 2, SOC 2 Type 1, SOC 1 Type 2.

Elk Grove Village Data Center Campus ORD2

Located in Elk Grove Village, IL, our ORD2 campus is located only 3 miles from O’Hare International Airport in a single-story purpose-built building. The structure is built with pre-fabricated concrete walls, and the 2014 Expansion is Uptime Institute Tier III Certified for Design and Build. Close to Interstates 294, 90 and Route 53, the data center is 19 miles from ORD1 and 18 miles from downtown Chicago.

Highlights
  • 405,000 sq/ft and 52 MW of power, located outside the 100-year flood zone
  • Fiber-linked campus between the 2 data centers in the heart of Chicago’s leading financial and telecom exchange
  • Access to the industry’s only on-demand colocation platform, CXD
  • Customer community of over 330 financial services firms, XaaS providers, media companies, and other large enterprises
  • Compliance with SSAE18, SOC-1, SOC-2, ISO 27001, PCI DSS, and NIST 800-53PE standards
  • HIPAA aligned
  • Connectivity to 22 unique network service providers and an average of 16 providers per Chicago data center
  • Solution deployment options include individual Secure Cabinets and dedicated Secure Cages
Amenities
  • Free secure Wi-Fi
  • Break room
  • Food and beverage vending machines
  • Crash carts and loaner tools
  • Work kiosks
  • Conference room
Technical Specifications

Utility Power 50 MW*

UPS Capacity 11.6 MW*

UPS Configuration 2N and N+1

Generator Capacity 17.6 MW*

Generator Configuration N+1

Fuel Capacity 80,000 Gal.*

Cooling Configuration N+1

Cooling Capacity 4,080 Tons*

Carriers

AT&T
CenturyLink
Cogent
Comcast
Level 3
Lighttower
Global Reliance
Sunesys
Verizon
XO
Zayo


1 Products at this Location in the MarketplaceAnd over 336 at other 3107 locations!
Certifications
Ok
HIPAA
Close
HITECH
Ok
PCI-DSS
Ok
ISAE-3402
Close
SSAE-16 Type 1
Ok
SOC 2 Type 2
Ok
ISO 27001
Close
ISO 22301
Close
ISO 50001
Close
ISO 90001
Close
ISO 14001
Close
NIST Cloud
Close
FISMA
Close
DIACAP
Close
SOX
Close
FIPS-140
Close
EHNAC
Close
EU-US
Close
Privacy Shield
Ok
SOC 1
Ok
SOC 2
Close
SOC 3
Ok
SOC 2 Type 1
Close
SSAE-16 Type 2
Close
FedRAMP
Ok
SOC 1 Type 2
Ok
NIST 800-53
Ok
SSAE-18
Close
LEED
Facility Types
Close
Internet Exchange
Close
Cloud Node
Ok
Colocation Facility
Close
DRBC Site
;