Get Colocation Pricing Now! +1 833-471-7100

AAIM Data Center: Minnesota 1 Data Center

AAIM Data Center Minnesota 1 Data Center is located at Minnesota City, Minnesota, United States. The gross building size for this location has not been provided. There is a total of 10000 sqft in raised floor space for colocation. No power information has been offered for this location. We found 4 data center locations within 50 miles of this facility. No certifications are specified for this location.
Colocation Facility
Colocation

About Minnesota 1 Data Center

AAIM Minnesota 1 Data Center in Blue Earth, Minnesota provides colocation infrastructure for high-performance computing, enterprise data, and crypto mining workloads in southern Minnesota. The facility is positioned along Highway 169 near local utility and fiber infrastructure, giving AAIM a power-focused deployment site outside the Minneapolis–Saint Paul metro. Minnesota 1 is part of AAIM’s Midwest data center platform and is designed for adaptable compute environments that require scalable power, regional network access, and purpose-built deployment capacity.

The Blue Earth facility is a 10,000 sq ft building located between the Blue Earth Light and Water substation and a nearby commercial corridor. AAIM’s Minnesota page lists 15 MW for the site and an in-service date of June 2025. The facility supports colocation use cases and aligns with AAIM’s focus on high-performance computing, enterprise data, and digital asset infrastructure. The site benefits from access to lower-cost local power, nearby substation infrastructure, and high-speed fiber availability from Bevcomm.

Blue Earth sits in Faribault County near the southern Minnesota border, roughly 120 miles south of Minneapolis and close to the Blue Earth River, Interstate 90, and U.S. Highway 169. This location supports energy-intensive infrastructure in a community with municipal utility engagement and available industrial development space. Minnesota 1 gives AAIM a strategic base for continued Minnesota expansion while serving customers that need compute capacity outside dense urban markets.

🏢 Facility Highlights

  1. Facility Type: Purpose-built data center building.
  2. Building Size: 10,000 sq ft.
  3. Listed Site Capacity: 15 MW.
  4. In-Service Date: June 2025.
  5. Primary Use: Colocation.
  6. Location: Highway 169 in Blue Earth, Minnesota.

🌐 Connectivity & Carrier Access

  1. Fiber Availability: Bevcomm fiber service supports high-speed connectivity in Blue Earth.
  2. Regional Routes: Highway 169 and Interstate 90 provide regional infrastructure access.
  3. Market Position: Southern Minnesota deployment location outside the Minneapolis–Saint Paul metro.

🏭 Who It Serves

  1. High-Performance Computing: Dense compute and accelerated processing workloads.
  2. Enterprise Data: Business infrastructure and data workloads requiring scalable space and power.
  3. Crypto Mining: Digital asset infrastructure and mining deployments.
  4. Power-Focused Deployments: Compute environments that prioritize utility access and expansion capacity.

🌱 Sustainability & Energy

  1. Utility Partnership: Minnesota 1 is positioned near Blue Earth Light and Water infrastructure.
  2. Energy Strategy: The facility supports AAIM’s regional energy-aligned expansion model.
  3. Expansion Capacity: Minnesota remains a target market for additional AAIM data center growth.