HKG10 is a Goodman data center project in Hong Kong SAR marketed as Goodman HK10 Data Centre (also referenced by Goodman as Goodman Texaco Data Centre). Goodman positions the site in Tsuen Wan / Kwai Chung, one of Hong Kong’s major data centre availability zones.
Goodman publishes a dedicated Hong Kong property page for Goodman HK10 Data Centre with an address in Tsuen Wan, plus high level design and utility power positioning. Goodman’s global pipeline materials also list HKG10 as a Hong Kong SAR development with 32MW IT power, 50MW of primary power secured, and full completion in 2026.
Goodman does not publish a facility operated retail service catalogue (colocation products, bare metal, IaaS) for HKG10 on the available public materials. Not publicly disclosed.
⚙️ Facility Highlights
Facility identity (operator stated): Goodman publishes the site as GOODMAN HK10 DATA CENTRE and describes it as “a modern, high tier data centre designed to market leading specifications.”
Address (operator stated): 126 to 140 Texaco Road, Tsuen Wan, Hong Kong is published on the Goodman Texaco Data Centre page for Goodman HK10 Data Centre.
Market positioning (operator stated): Goodman states the facility is strategically located in Tsuen Wan / Kwai Chung, one of Hong Kong’s three major data centre availability zones.
Utility power (operator stated): Goodman lists 100 MVA utility power (primary and alternative) on the Goodman Texaco Data Centre page.
Primary utility power (operator stated): Goodman’s Hong Kong data centre partnership materials describe HKG10 as offering 50MVA of primary utility power.
IT power (operator stated): Goodman’s global pipeline lists 32MW IT power for Hong Kong SAR HKG10.
Resilience design statement (operator stated): Goodman states the facility is designed as a 2N facility, including redundant power, water, and fuel systems.
Substations (operator stated): Goodman lists 132 kV dedicated data centre substations on the Goodman Texaco Data Centre page.
Building form factor (operator stated): Goodman lists 14 floors plus roof and a 20,861 sq ft typical floor plate.
Completion timing (operator stated): Goodman’s global pipeline lists full completion in 2026 for HKG10, and the Hong Kong partnership page also states anticipated completion in 2026.
🔐 Security & Compliance
Facility specific physical security systems (CCTV, guard force, mantraps, biometrics, access policies): Not publicly disclosed.
Fire detection and suppression systems (facility specific): Not publicly disclosed.
Compliance certifications (facility specific ISO, SOC, PCI, certificate IDs, audit scope): Not publicly disclosed.
Sustainability certification (operator stated): Goodman lists LEED Gold pre certified for Goodman HK10 Data Centre.
🌐 Connectivity & Carrier Access
Carrier roster on net (facility specific): Not publicly disclosed.
Meet me room / cross connect products / pricing (facility specific): Not publicly disclosed.
Internet Exchange (IX): Not publicly disclosed.
PeeringDB facility record (third party directory): A PeeringDB facility record specifically identifiable as Goodman HKG10 / Goodman HK10 Data Centre / Goodman Texaco Data Centre was not located via public search results. Not publicly listed.
💼 Who It Serves
Organizations requiring Hong Kong SAR capacity in the Tsuen Wan / Kwai Chung availability zone (operator stated positioning): Goodman positions HK10 for low latency connectivity within Hong Kong’s digital landscape and for deployments needing a major Hong Kong availability zone location.
Large scale deployments aligned to published power and resilience positioning (operator stated): Customers whose requirements align with Goodman’s published 32MW IT power, 100 MVA utility power (primary and alternative), and 2N design statement.
NOTE: “under construction or scheduled to commence development by June 2026.”