Goodman Group: PAR01
About PAR01
PAR01 is a data centre development site published by Goodman as a Data Centre property in Tremblay en France (north of Paris) with the address 13 Rue Charles Cros, 93290 Tremblay en France, France.
Goodman positions PAR01 as a 72 MW IT campus within the Paris North data centre cluster, describing the project as a revitalisation of a former logistics warehouse using a circular deconstruction approach and highlighting secured power and multi carrier connectivity at the plot.
Goodman publishes site level technical attributes (IT power, secured capacity, HV substation details, structural limits, and sustainability targets), but does not publish a customer facing, facility run service catalogue (colocation products, bare metal, IaaS) for PAR01. Not publicly disclosed.
⚙️ Facility Highlights
- Facility identity (operator stated): Goodman lists the site as PAR01 Data Centre and classifies the property type as Data Centre.
- Address (operator stated): 13 Rue Charles Cros, 93290 Tremblay en France, France.
- Campus IT power (operator stated): Up to 72 MW IT campus and 72 MW IT power are published on the property page.
- Power capacity secured (operator stated): Goodman publishes 105 MW capacity and states 105 MW power capacity secured.
- Plot size (operator stated): 53,000 sqm plot size is published on the property page and in the PAR I brochure.
- Electrical infrastructure (operator stated): Goodman lists an on site high voltage substation (225kV to 20kV) and a 105 MW redundant high voltage connection for PAR01.
- Design level statement (operator stated): Goodman lists Tier 3 compliant design for PAR01.
- Structural limits (operator stated): Goodman lists 2 tons floor load per sqm and clear height 6.1m on the property page.
- Campus configuration (operator stated, brochure): The PAR I brochure describes the campus as three blocks of 24 MW IT each (Blocks A, B, C) and indicates each block has three floors with two data halls per floor, with each hall around 1,380 sqm (brochure).
- Connectivity positioning (operator stated): Goodman states multi carrier connectivity and that a direct connection to fibre network is available at the plot; it also references Tier 1 fibre carriers in close proximity (examples listed include EuNetworks, Colt, GTT, Orange, SFR, Zayo).
- Risk profile positioning (operator stated): Goodman states the site is outside flooding and earthquake zones and outside flight corridors from Paris CDG airport, and notes no hazardous uses or high risk industrial businesses in the immediate neighbourhood.
- Sustainability features (operator stated): Goodman lists GreenSpace+ positioning including LEED Platinum targeted, waste heat recovery ready, EV parking, green roofs and PV, and waterless cooling as part of the sustainability narrative.
🔐 Security & Compliance
- CCTV (operator stated): Goodman lists CCTV surveillance for PAR01.
- Facility specific physical security systems (guard force, mantraps, biometrics, access policies): Not publicly disclosed.
- Fire detection and suppression systems (facility specific): Not publicly disclosed.
- Compliance certifications (facility specific ISO, SOC, PCI, certificate IDs, audit scope): Not publicly disclosed.
🌐 Connectivity & Carrier Access
- Networks present (third party directory): Not publicly listed for PAR01 under Goodman in the available public directory search.
- Carriers on net (facility specific): Not publicly disclosed.
- Meet me room / cross connect products / pricing (facility specific): Not publicly disclosed.
- Internet Exchange (IX) (facility specific): Not publicly disclosed.
- Connectivity positioning (operator stated): Goodman states multi carrier connectivity and direct fibre network connection available at the plot, but does not publish an on net carrier roster for PAR01.
💼 Who It Serves
- Large scale data centre operators (operator stated positioning): Goodman positions PAR01 as a large scale campus in a core Paris market cluster intended to support large operator deployments, with secured power and multi carrier connectivity.
- Customers prioritising Paris North cluster proximity (operator stated): Organizations seeking a north of Paris location with low latency connectivity positioning within the Paris North data centre cluster.
- Sustainability and heat reuse aligned deployments (operator stated, brochure): Customers seeking projects with stated sustainability targets and potential waste heat reuse enablement as described in the PAR I brochure.
NOTE: “under construction or scheduled to commence development by June 2026.”