Goodman Group: SYD01

Goodman Group SYD01 is located at Sydney NSW, Australia. The gross building size for this location has not been provided. The gross colocation space is not available for this data center. No power information has been offered for this location. We found 100 data center locations within 50 miles of this facility. Certifications for this location include ISO 14001, ISO 27001, ISO 9001, PCI DSS.

About SYD01

SYD01 is a Goodman data center development in Artarmon (Sydney’s North Shore). Goodman markets SYD01 as its first fully fitted and operated data centre in Australia, under construction and delivered in stages.

Planning and construction documentation published on Goodman’s Australia site references the project as the Lanceley Place Data Centre, Artarmon, with the project location listed as 2–8 Lanceley Place and 14 Campbell Street, Artarmon and the project name “Goodman SYD01.”

Goodman’s March 2, 2026 announcement describes SYD01 as a 90MW secured power site delivering 61MW of digital infrastructure, with the first phase ready for service in Q2 2028.

⚙️ Facility Highlights

Facility identity (operator-stated): Goodman markets the facility as Goodman SYD01 and positions it as its first fully fitted and operated data centre in Australia.

Location (operator-stated): Goodman states SYD01 is under construction in Artarmon, Sydney.

Address (planning / project documentation): Project location is listed as 2–8 Lanceley Place and 14 Campbell Street, Artarmon (NSW) in a Goodman SYD01 construction management PDF.

Power and capacity (operator-stated): Goodman markets SYD01 as a 90MW data centre with 61MW IT capacity.

Power and capacity (operator announcement): Goodman’s March 2, 2026 announcement describes SYD01 as a 90MW secured power site delivering 61MW of digital infrastructure.

Design and operations features (operator announcement): Goodman states SYD01 is engineered for low latency and security and includes items such as a modular deployment model, 24/7 on-site operations, high availability management systems, efficient power and cooling aimed at optimising PUE and WUE, and carrier-neutral connectivity with two meet-me rooms and four diverse points of entry.

Staging / delivery timeline (operator-stated): Goodman states SYD01 is delivered across five stages and that the first phase will be ready for service in early 2028.

First phase timing (operator announcement): Goodman states the first phase will be ready for service in Q2 2028.

Planning / built form context (project documentation): A Goodman SYD01 construction management PDF describes the proposal as operating 24 hours and references a maximum building height of 51.479m and a total gross floor area of 57,219 m² (project documentation).

Electrical and site infrastructure context (project documentation): The same project documentation references an 80 MVA total power supply, five levels of technical data hall floor space, and on-site infrastructure including diesel storage tanks, water tanks, and 33kV switch-rooms (project documentation).

🔐 Security & Compliance

Facility-specific security systems (CCTV, guard force, mantraps, biometrics, access policies): Not publicly disclosed.

Fire detection and suppression systems (facility-specific): Not publicly disclosed.

Compliance certifications (facility-specific ISO, SOC, PCI, certificate IDs, audit scope): Not publicly disclosed.

🌐 Connectivity & Carrier Access

Carrier-neutral positioning (operator announcement): Goodman states SYD01 supports carrier-neutral connectivity and references two meet-me rooms and four diverse points of entry.

Carriers on-net (facility-specific carrier roster): Not publicly disclosed.

Cross-connect products / pricing (facility-specific): Not publicly disclosed.

Internet Exchange (IX) operation at this facility: Not publicly disclosed.

PeeringDB facility record (third-party directory): Not publicly listed.

💼 Who It Serves

Hyperscale customers (operator-stated): Goodman positions SYD01 as purpose-designed for hyperscale customers seeking rapid deployment, expansion, and high-availability operations.

Organizations needing metro Sydney / North Shore proximity (operator-stated): Goodman positions SYD01 as a premium metro location in Sydney with scalable power and connectivity characteristics aligned to AI and cloud demand (project-level positioning).

NOTE: “under construction or scheduled to commence development by June 2026.”