Get Colocation Pricing Now! +1 833-471-7100

Greystoke: Humber Tech Park

Greystoke Humber Tech Park is located at South Killingholme, North Lincolnshire, UK. The data center is 309000 sqft. The gross colocation space is not available for this data center. It has access to 384.0 MW of power. We found 11 data center locations within 50 miles of this facility. Certifications for this location include ISO 14001.
Colocation Facility
Colocation

About Humber Tech Park

Humber Tech Park is a proposed AI-focused data centre campus in North Lincolnshire. The official planning application identifies the applicant as Humber Tech Park Ltd and describes an outline consent for a data centre development of up to 309,000 m² (GEA) delivered across up to three buildings, including an on-site electricity substation and associated infrastructure.

Greystoke’s official website describes Humber Tech Park as a 384 MW AI training data centre project with outline planning permission granted in August 2024 and reserved matters underway.

⚙️ Facility Highlights

  1. Facility identity (planning authority): Humber Tech Park (outline planning application PA/2024/584; Applicant: Humber Tech Park Ltd).
  2. Development status (planning authority): Outline planning permission approved with conditions; Decision date: 28 August 2024 (all matters reserved).
  3. Location (planning authority): Land south of the A160, South Killingholme (Parish: South Killingholme; Ward: Ferry; grid reference published in the planning record).
  4. IT load / capacity (developer-stated, project-level): 384 MW stated for the Humber Tech Park AI data centre project.
  5. Campus configuration (planning authority): Up to three buildings delivering up to 309,000 m² (GEA), including ancillary offices, internal plant/equipment, emergency generators and fuel storage, plus associated works.
  6. Site scale (developer-stated, project-level): 200 acre site and “comprises three buildings” (project description).
  7. Power and fibre entries (developer-stated, project-level): “Multiple fibre and power entries” stated for the site.
  8. Substation proximity (developer-stated, project-level): Site described as proximate to Killingholme substation and the South Humber Bank.
  9. Waste-heat reuse concept (developer-stated, project-level): Data centres/substation described as adjacent to a greenhouse intended to benefit from waste heat.
  10. Street address (facility-specific): Not publicly disclosed. (Planning record provides a site-location description rather than a street address.)

🔐 Security & Compliance

  1. Facility-specific security systems (CCTV, mantraps, biometrics, guard force, access policies): Not publicly disclosed.
  2. Planning-scope security elements (planning authority): Outline description includes security perimeter fencing (system details not specified).
  3. Compliance certifications (facility-specific ISO/SOC/PCI, certificate IDs, audit scope): Not publicly disclosed.

🌐 Connectivity & Carrier Access

  1. Carrier list / networks present (facility-specific): Not publicly disclosed.
  2. Connectivity statements (developer-stated, project-level): Site described as having multiple fibre entries (carrier roster and interconnection products not published).
  3. Meet-me room / cross-connect products / pricing (facility-specific): Not publicly disclosed.
  4. Internet Exchange (IX) (facility-specific): Not publicly disclosed.

💼 Who It Serves

  1. Organizations seeking future capacity aligned to a planned AI training / high-performance computing campus with a stated 384 MW IT load target (project-level).
  2. Customers planning large, multi-building deployments where the planning approval covers up to three buildings and large-scale enabling infrastructure (substation, generators, internal roads, etc.).