Hscale: Osl3

Hscale Osl3 is located at Oslo, Norway. The gross building size for this location has not been provided. The gross colocation space is not available for this data center. No power information has been offered for this location. We found 26 data center locations within 50 miles of this facility. No certifications are specified for this location.

About Osl3

OSL3 is published by hscale as part of its Norway, Oslo campus portfolio, with the operator stating the campuses are located in Hønefoss, close to Oslo and Norway’s largest international airport. hscale lists OSL3 as a separate campus entry on its official site, with a stated Q4 2028 target timeline.

hscale positions the broader Oslo campus as having secured power to deliver up to 150MW IT, and for OSL3 specifically it publishes a planned 120MW IT load across 3 buildings, along with topology targets and “dual-fed power” intent. A street-level address for OSL3 is Not publicly disclosed on the operator’s OSL page.

⚙️ Facility Highlights

  1. Facility identity (operator-stated): Facility/campus name published by the operator: OSL3 (Norway, Oslo).
  2. Location (operator-stated, area-level): Hønefoss (OSL3 is stated as “a continuation of our two campuses in Oslo, located in Hønefoss”).
  3. Address (facility-specific): Not publicly disclosed.
  4. Development status (operator-stated): Site in development.
  5. RFS / timeline (operator-stated): OSL3 Q4 2028 (operator lists OSL3 with a Q4 2028 target and labels “Q4 target RFS date” in the OSL3 overview).
  6. Planned IT load & buildings (operator-stated, campus-level): Planned 120MW IT load across 3 buildings.
  7. Topology targets (operator-stated): N+1 electrical topology and N+1 cooling topology.
  8. Power sourcing intent (operator-stated): Dual-fed power targeted, power reserved (as published on the OSL3 campus features list).
  9. Oslo campus context (operator-stated, portfolio-level): hscale states the OSL campus has secured power to deliver up to 150MW IT (campus-level statement; OSL3-specific delivered capacity is not published).
  10. Third-party campus context (industry association): Norsk Datasenter Industri states a total 200MW of IT load is planned across the entire campus and that three sites are under development with the first 6MW already live and an additional 12MW under construction (campus-level context; OSL3 allocation beyond hscale’s published 120MW plan is not detailed there).

🔐 Security & Compliance

  1. Facility-specific security systems (CCTV, mantraps, biometrics, guard force, access policies): Not publicly disclosed for OSL3.
  2. Compliance certifications (facility-specific ISO/SOC/PCI, certificate IDs, audit scope): Not publicly disclosed for OSL3.
  3. Operator-level security governance (organization-level): hscale references rigorous cyber and physical security protocols including penetration tests and maturity assessments as campus features (OSL1 section on the same Norway page); OSL3-specific control implementation details are Not publicly disclosed.

🌐 Connectivity & Carrier Access

  1. Carrier neutrality (facility-specific): Not publicly disclosed.
  2. On-net carriers / carrier roster (facility-specific): Not publicly disclosed.
  3. Meet-me room / cross-connect products / pricing (facility-specific): Not publicly disclosed.
  4. Internet Exchange (IX): Not publicly disclosed.

💼 Who It Serves

  1. Hyperscalers and large-scale operators planning Norway capacity where hscale publishes OSL3 as a 120MW IT (planned) campus across 3 buildings with N+1 electrical and N+1 cooling targets.
  2. Organizations prioritizing long-term power strategy where the operator states dual-fed power targeted and power reserved for OSL3 (deliverable service configurations are Not publicly disclosed).
  3. Capacity planners using Oslo campus context where the operator states up to 150MW IT secured power for the broader OSL campus (campus-level statement; OSL3 delivered capacity is Not publicly disclosed).