Northern Data AG: Boden (Sweden) — Hydro66
About Boden (Sweden) — Hydro66
Boden refers to a Northern Sweden data center site in the city of Boden that Northern Data acquired from data center operator Hydro66. Northern Data’s official public communications describe the site at a campus level (city, hall count, land area, sustainability/efficiency positioning), but do not publish a dedicated facility page with a confirmed street address or a facility specification sheet. Not publicly disclosed.
Taiga Cloud Services documentation lists Boden, Sweden as one of its cloud data center locations, indicating Northern Data’s cloud footprint includes Boden.
⚙️ Facility Highlights
Facility identity: Northern Data describes the acquired site as a data center facility in Boden (Northern Sweden) that was completed by Hydro66 in 2019 before being acquired by Northern Data Group.
Location: Boden, Sweden (city-level).
Site composition: The site is described as consisting of six data center halls/facilities on an area of 2.5 hectares.
Power sourcing: The site is described as being powered by 100% renewable electricity sourced from regional hydropower generation.
Efficiency positioning: Northern Data’s communications and reporting tied to the acquisition reference a PUE of 1.07 for the site.
Climate positioning: The region is cited as enabling energy-saving cooling conditions (average annual temperature 1.3°C referenced in reporting).
Street address (facility): Not publicly disclosed.
Hydro66 corporate visit address (not confirmed as facility address): Public Swedish business listings show Hydro66 Svenska AB with visit address Hydrogränd 2, 961 43 Boden, Sweden. This is not published by Northern Data as the data center facility address.
🔐 Security & Compliance
Facility-specific security systems (CCTV, guard force, mantraps, biometrics, access policies): Not publicly disclosed.
Fire detection and suppression systems: Not publicly disclosed.
Compliance certifications (facility-specific ISO/SOC/PCI, certificate IDs, audit scope): Northern Data related reporting references “various ISO certifications,” but the specific ISO standards, certificate IDs, and audit scope are Not publicly disclosed.
🌐 Connectivity & Carrier Access
Carrier roster on-net: Not publicly disclosed.
Meet-me room / cross-connect products / pricing: Not publicly disclosed.
Internet Exchange (IX): Not publicly disclosed.
Third-party interconnection directory facility record: A PeeringDB facility record specifically identifiable as a Hydro66/Northern Data Boden facility was not confirmed via the available public search results. Not publicly listed.
💼 Who It Serves
HPC / high-density compute demand (site positioning): Northern Data positions the acquisition as supporting demand for large-scale compute capacity and ongoing expansion at the site.
Cloud customers (Taiga Cloud footprint): Taiga Cloud Services documentation lists Boden, Sweden as a cloud data center location.