Pure DC: FIN campus
Pure DC FIN campus is located at Seinäjoki, Finland. The gross building size for this location has not been provided. The gross colocation space is not available for this data center. No power information has been offered for this location. We found 0 data center locations within 50 miles of this facility. No certifications are specified for this location.
Colocation
About FIN campus
Finland (Seinäjoki) — FIN campus is published by Pure DC on its official website as “Finland Seinäjoki (FIN01)”, described as a major AI-focused campus development in west Finland.
Pure DC states it controls 370+ acres for the site and is targeting 500MW of IT capacity supported by 700MVA of accessible renewable power; a third-party industry report (Data Center Dynamics) separately reports the same headline figures as Pure’s Finland expansion details.
⚙️ Facility Highlights
- Facility identity (operator-stated): Site is published as “Finland Seinäjoki (FIN01)” on Pure DC’s official website.
- Location (operator-stated): Seinäjoki, west Finland (regional positioning; street address is not provided).
- Land control (operator-stated): Pure DC states it controls over 370 acres of land under development for the campus.
- IT capacity target (operator-stated): Pure DC states the site is targeted to support over 500MW of IT capacity for mass-scale AI and machine learning workloads.
- Power availability (operator-stated): Pure DC states access to more than 700MVA of renewable power for the campus.
- Module strategy (operator-stated): Development strategy is based on repeatable 40MW “AI-ready” modules.
- Cooling approach (operator-stated): Modules are described as built with Direct Liquid Cooling (DLC) to support high-density thermal demands.
- Electrical infrastructure status (operator-stated): Pure DC states the substation for the first data hall is constructed and live.
- Third-party confirmation of key campus descriptors (industry reporting): Data Center Dynamics reports Pure is developing a 500MW site on 370 acres in Seinäjoki, using repeatable 40MW AI-ready modules with liquid cooling, and that the substation for the first data hall is constructed and live.
- Street address (facility-specific): Not publicly disclosed.
🔐 Security & Compliance
- Facility-specific security systems (CCTV, mantraps, biometrics, guard force, access policies): Not publicly disclosed.
- Compliance certifications (facility-specific ISO/SOC/PCI, certificate IDs, audit scope): Not publicly disclosed.
🌐 Connectivity & Carrier Access
- Networks present / carriers on-net (facility-specific): Not publicly disclosed.
- Meet-me room / cross-connect products / pricing (facility-specific): Not publicly disclosed.
- Internet Exchange (IX) (facility-specific): Not publicly disclosed.
- Third-party directory context (campus references): Baxtel lists “Pure DC: Seinäjoki, Finland” and multiple nearby FIN01 building entries described as located on the Seinäjoki FIN01 campus; connectivity specifics for the campus are not provided in the accessible listing content.
💼 Who It Serves
- Organizations planning large-scale AI and machine learning deployments aligned with Pure DC’s stated target of 500MW+ IT capacity at the Seinäjoki campus.
- Customers requiring modular expansion aligned with Pure DC’s stated strategy of repeatable 40MW AI-ready modules.
- Users prioritizing campuses described as supported by renewable power access (700MVA+) and a live substation for initial delivery phases.