Pure DC: LON02
Pure DC LON02 is located at London, United Kingdom. The data center is 22365 sqft. The gross colocation space is not available for this data center. It has access to 56.0 MW of power. We found 327 data center locations within 50 miles of this facility. Certifications for this location include ISO 14001, ISO 27001, ISO 9001, SOC 1 Type 2.
About LON02
London (Park Royal) — LON02 is published by Pure DC on its official website as “London Park Royal (LON02)”, described as a joint venture between Pure DC and SEGRO to deliver a next-generation, liquid-cooled data centre on a super-prime Park Royal site in West London.
Pure DC publishes project-level metrics (land area, building size, PUE, WUE approach, status, and power substation capacity) and states construction is scheduled to begin in 2026, with operations targeted for 2029.
⚙️ Facility Highlights
- Facility identity (operator-stated, facility page): Facility name published as “London Park Royal (LON02)”.
- Joint venture (operator-stated, facility page): Pure DC states Park Royal is a joint venture between Pure DC and SEGRO.
- Planned capacity statement (operator-stated, facility page): Pure DC states the project is intended to deliver over 56MW.
- Power provisioning (operator-stated, facility page): Pure DC states the project secures 70MVA of dedicated power via a new substation, sourced primarily from renewables.
- Substation capability (operator-stated, facility page): Pure DC states the campus will be powered via a dedicated substation capable of supporting a 72MW data centre.
- Land area (operator-stated, facility page): 9.64 acres.
- DC buildings (operator-stated, facility page): 1.
- Building size (operator-stated, facility page): 22,365 SQM.
- PUE (operator-stated, facility page): 1.24 average annualised (with a stated natural cooling claim for most of the year).
- WUE approach (operator-stated, facility page): Closed loop system (numeric WUE not published).
- Backup fuel (operator-stated, facility page): Backup generators fuelled by 100% HVO (Hydrotreated Vegetable Oil).
- Status (operator-stated, facility page): Permitting underway.
- Construction / operations timing (operator-stated, facility page): Construction scheduled to begin 2026; operations targeted for 2029.
- Planning reference (project partner site): SEGRO’s Premier Park Data Centre site states a planning application has been submitted to OPDC (reference 25/0196/FUMOPDC).
- Street address (facility-specific): Not publicly disclosed.
🔐 Security & Compliance
- Facility-specific security systems (CCTV, mantraps, biometrics, guard force, access policies): Not publicly disclosed.
- Compliance certifications (facility-specific ISO/SOC/PCI, certificate IDs, audit scope): Not publicly disclosed.
🌐 Connectivity & Carrier Access
- Networks present / carriers on-net (facility-specific): Not publicly disclosed.
- Meet-me room / cross-connect products / pricing (facility-specific): Not publicly disclosed.
- Internet Exchange (IX) (facility-specific): Not publicly disclosed.
💼 Who It Serves
- Organizations seeking capacity aligned to a planned Park Royal site described by Pure DC as AI-ready and designed for long-term resilience (workload/service catalog is Not publicly disclosed).
- Customers requiring large-scale London availability-zone capacity aligned to the operator-stated 56MW+ delivery intent and dedicated substation provisioning (commercial service terms are Not publicly disclosed).
- Stakeholders evaluating the Park Royal development referenced by SEGRO/Pure DC project communications and OPDC planning process (connectivity specifics are Not publicly disclosed).
Contact Pure DC
Complete the form to get in direct contact with Pure DC.