Get Colocation Pricing Now! +1 833-471-7100

Seznam.cz: Nagoya Data Center

Seznam.cz Nagoya Data Center is located at Průmyslová, 29471 Benátky nad Jizerou, Central Bohemian, Czech Republic. The data center is 12917 sqft. The gross colocation space is not available for this data center. It has access to 3.0 MW of power. We found 30 data center locations within 50 miles of this facility. Certifications for this location include ISO 14001, ISO 27001, ISO 9001.
Colocation Facility
Colocation

About Nagoya Data Center

Nagoya Data Center is a data center facility operated for Seznam.cz, a.s. in Benátky nad Jizerou, Czech Republic. Seznam identifies Nagoya as its second proprietary data center and states that it is located on Průmyslová Street in Benátky nad Jizerou, near Exit 27 of the D10 motorway. A Mapy.com location entry for the facility lists the site as Průmyslová 1012, 294 71 Benátky nad Jizerou II, Czechia.

Benátky nad Jizerou sits northeast of Prague within the wider Central Bohemian economic corridor, giving the site geographic separation from the capital while preserving practical access to the Prague metro and national network routes. Seznam positions Nagoya as a core part of its owned infrastructure platform alongside Kokura, supporting resilience, energy efficiency, and continued expansion of the company’s digital service capacity.

⚙️ Facility Highlights

  1. Facility identity and operator: Seznam identifies Nagoya as its second proprietary data center in Benátky nad Jizerou.
  2. Location context: The facility is on Průmyslová Street near D10 Exit 27.
  3. Commissioning timeline: Seznam states the cornerstone was laid on 22 February 2022, and pilot operation started on 9 March 2023.
  4. Facility scale: Seznam states the building has an area of approximately 1,200 m².
  5. Data hall configuration: Third-party infrastructure reporting describes the site as having two data halls and capacity for 200 racks.
  6. Power capacity: Third-party infrastructure reporting describes the facility as a 3 MW data center. Seznam’s later 2024 update also states that across its owned sites, Nagoya and Kokura, up to 6 MW of IT power is planned in total.
  7. Cooling design: Industry reporting on the project describes indirect free cooling, while Seznam positions the site as a technologically advanced addition to its owned data center platform.
  8. Energy efficiency: Third-party reporting describes a target PUE of 1.1 for Nagoya.
  9. Expansion readiness: Third-party reporting notes adjacent land for possible future build-out or photovoltaic development.

🔐 Security & Compliance

  1. Operational resilience: Seznam presents Nagoya as part of its owned infrastructure strategy designed to reduce dependence on external suppliers and strengthen service continuity.
  2. Enterprise-grade design context: Seznam describes the facility as part of a long-term infrastructure expansion supporting large-scale processing of company data and services.

🌐 Connectivity & Carrier Access

  1. Regional connectivity positioning: Nagoya is located outside Prague but within reach of the capital’s main digital and telecommunications market through the D10 corridor and Seznam’s broader infrastructure footprint. This is an inference from the published site location and Seznam’s owned multi-site platform.
  2. Platform role: Seznam positions Nagoya as one of its owned production data centers, supporting internal digital services at scale.

💼 Who It Serves

  1. Seznam’s own digital service infrastructure, including large-scale internal production workloads.
  2. Internal platforms requiring additional owned capacity as Seznam expands processing and storage capability.