UnitedLayer: 200 Paul Data Center
UnitedLayer 200 Paul Data Center is located at 200 Paul Avenue, San Francisco, CA, USA. The data center is 512642 sqft. There is a total of 32000 sqft in raised floor space for colocation. No power information has been offered for this location. We found 116 data center locations within 50 miles of this facility. Certifications for this location include PCI-DSS, ISO 27001, ISO 90001, ISO 14001, NIST 800-53, HIPAA, FedRAMP, NIST Cloud, SOC 1, SOC 2, SSAE-16 Type 1, SSAE-16 Type 2, SSAE-18.
Deploy and manage your existing hardware in our premier Tier-3 data center facility while still maintaining the level of access, control, and security of a data center that resides entirely on your premises. With UnitedLayer Colocation solutions you can eliminate the hassle and cost of running your own data center while setting yourself up for a future in the cloud.
UnitedLayer provides Colocation services from one of the largest data centers in San Francisco located at 200 Paul Ave. This is the only data center in San Francisco which is built on solid bedrock. This location serves many engineering, technology, and internet service providers and is the leading data center for the Bay Area and for San Francisco colocation.
BEST LOCATION
Only data center in San Francisco which is built on bedrock with Zone 4 construction and is not in the earthquake fault, liquefaction, or landslide zones, and is not in a 100-year flood plain.
TIER 3 INFRASTRUCTURE
A Tier-3 data center with superior outage protection to avoid any unplanned downtimes. Greater than N+1 architecture for uninterrupted power & cooling, 24×7 surveillance and 2FA access systems.
EXTREME CONNECTIVITY
UnitedLayer has 300+ carriers at its interconnection facilities and direct access to 3000+ carriers with extremely low latency connections to all clouds, enterprise data centers, and edge locations.
ON-DEMAND PRIVATE CLOUD SCALABILITY
UnitedLayer offers on-demand scalability where customers can add additional storage, compute, and networking resources within 15 mins instead of months to meet the increased business demands.