Raeden: Greensboro Data Center

Raeden Greensboro Data Center is located at 2901 East Gate City Boulevard, Greensboro, North Carolina 27401, United States. The gross building size for this location has not been provided. The gross colocation space is not available for this data center. It has access to 20.0 MW of power. We found 20 data center locations within 50 miles of this facility. No certifications are specified for this location.
Colocation Facility
Colocation

About Greensboro Data Center

Raeden Greensboro Data Center at 2901 E. Gate City Blvd in Greensboro, North Carolina is a planned AI-ready data center campus in the Gateway Research Park ecosystem near North Carolina Agricultural and Technical State University. The project, also branded as the Greensboro Dream Center, is planned to deliver 20 MW of critical power in Q1 2027 for high-density GPU workloads, AI infrastructure, machine learning, hyperscale, and enterprise compute deployments.

The Greensboro site is structured as a greenfield build-to-suit opportunity for an anchor tenant, with support for Direct-to-Chip Liquid Cooling, custom power and cooling configurations, and naming-right options for the initial building. Raeden’s partner ImpactData supports land, power, and partnership resources for the Dream Center model. The project is positioned to scale beyond the initial 20 MW phase, with Raeden listing the ability to scale to 100 MW+ across 38 acres.

The Greensboro location places the campus in the Carolina Core, a fast-growing North Carolina economic corridor attracting aerospace, biomedical, manufacturing, university research, and advanced technology activity. The project’s proximity to NCA&T, Gateway Research Park, Piedmont Triad International Airport, Interstate 40, and Interstate 85 gives AI infrastructure users access to power, land, workforce pipelines, and regional connectivity in the Piedmont Triad market.

🏢 Facility Highlights

  1. Planned Capacity: 20 MW of critical power.
  2. Delivery Target: Q1 2027.
  3. Campus Scale: 38 acres with potential to scale to 100 MW+.
  4. Deployment Model: Greenfield build-to-suit opportunity for an anchor tenant.
  5. Cooling Support: Direct-to-Chip Liquid Cooling.
  6. Configuration Flexibility: Custom power and cooling configurations available.

🧠 AI Infrastructure

  1. GPU Workloads: Designed for high-density GPU infrastructure.
  2. AI Talent Pipeline: Located near NCA&T’s AI academic program.
  3. Innovation Center: Planned virtual reality, mixed reality, robotics, fabrication, and prototyping spaces.
  4. Anchor Tenant Model: Tenant customization options for technical and workforce needs.

🛰️ Network Position

  1. Market: Greensboro and the Piedmont Triad.
  2. Research Ecosystem: Gateway Research Park and North Carolina A&T State University.
  3. Regional Corridor: Carolina Core industrial and technology corridor.
  4. Airport Access: Near Piedmont Triad International Airport.