Get Colocation Pricing Now! +1 833-471-7100

Stack Infrastructure: POR03E Data Center

Stack Infrastructure POR03E Data Center is located at 3983 Northeast Evergreen Road, Hillsboro, Oregon 97124, United States. The gross building size for this location has not been provided. The gross colocation space is not available for this data center. No power information has been offered for this location. We found 61 data center locations within 50 miles of this facility. No certifications are specified for this location.
Colocation Facility
Colocation

About POR03E Data Center

The POR03E Data Center is part of STACK Infrastructure’s POR03 campus in Hillsboro, Oregon, within the greater Portland market. Designed for AI, machine learning, and cloud workloads, POR03E sits on a large, sustainably focused campus that gives customers access to substantial long-term expansion capacity in one of the Pacific Northwest’s key digital infrastructure regions.

POR03E is grouped with POR03F as a combined development footprint totaling 530,000 square feet and 96MW of capacity within the broader 55-acre POR03 campus. STACK states that the full POR03 campus is engineered for approximately 200MW of total critical capacity, with a mix of operational, near-term available, and expansion capacity.

The campus is designed with sustainability in mind, including a low-water-use approach and direct access to the region’s renewable energy resources, supporting responsible infrastructure growth in Hillsboro.

⚙️ Facility Highlights

  1. Located in Hillsboro, Oregon within STACK’s POR03 campus.
  2. Part of a 55-acre campus designed for AI, ML, and cloud infrastructure.
  3. Included in the POR03E/F development footprint totaling 530,000 SF.
  4. Associated with 96MW of capacity across the POR03E/F section.
  5. Part of a broader campus with approximately 200MW of total critical capacity.
  6. Built to support scalable growth with speed and certainty across the Portland market.

🔌 Power Infrastructure

  1. POR03 is described as providing approximately 200MW of total critical capacity campus-wide.
  2. The POR03E/F component is listed at 96MW.
  3. Campus planning includes 25MW with near-term availability, 96MW of expansion capacity, and 72MW of operational critical capacity.

🌿 Sustainability

  1. Designed with a low-water-use approach.
  2. Benefits from direct access to regional renewable energy resources.
  3. Positioned as part of STACK’s sustainably focused Portland expansion strategy.

🌐 Connectivity & Market Position

  1. Located in the Portland/Hillsboro market, a major Pacific Northwest data center hub.
  2. Designed to support AI, ML, and cloud workloads, indicating suitability for high-performance and hyperscale-style deployments.

💼 Who It Serves

  1. Organizations deploying AI and machine learning infrastructure.
  2. Cloud and digital platform operators seeking large-scale expansion capacity in Hillsboro.
  3. Enterprises requiring long-term, scalable infrastructure in the Pacific Northwest.