Edged: Edged Phoenix Data Center
Edged Edged Phoenix Data Center is located at 8811 East Warner Road, Mesa, AZ 85212, USA. The gross building size for this location has not been provided. The gross colocation space is not available for this data center. It has access to 36.0 MW of power. We found 135 data center locations within 50 miles of this facility. No certifications are specified for this location.
Colocation
About Edged Phoenix Data Center
The Edged Phoenix City Data Center (also called Edged Phoenix, PHX01) is a state-of-the-art facility located at 8811 East Warner Road, Mesa, Arizona, east of Highway 202. Operated by Edged (an Edged Energy / Endeavour company), it is designed to serve the fast-growing Southwest U.S. market, especially for AI, high-performance computing, and enterprise workloads.
Its positioning benefits from low latency to major metro areas, strong solar energy availability, competitive energy costs via local utility (Salt River Project), and a business-friendly regulatory environment.
⚙️ Facility Highlights
- Power Capacity: 36 MW of critical load planned.
- Size & Site: Approximately 210,000 square feet (≈ 19,510 m²) facility footprint on about 12 acres. Two-story construction.
- Cooling System: Advanced waterless cooling (“ThermalWorks” system) supporting high densities: up to ~70 kW/rack with air-cooling, and up to ~200 kW/rack with plug-and-play liquid cooling integration.
- Efficiency: Designed for a PUE (Power Usage Effectiveness) of ~1.15 (portfolio average) and consumes zero water in cooling.
- Construction & Design: Two stories, includes loading dock bays, meet-me rooms, slab floor, white space designed for high-density compute.
🔐 Security & Compliance
- Physical Security & Access: 24 × 7 × 365 access controls. Onsite offices and loading docks indicate logistics readiness.
- Reliability / Redundancy: Tier III design with concurrently maintainable infrastructure; N+1 power, UPS, and cooling systems to ensure high availability.
- Standby Power & Backup: Standby generation systems (engines Tier-4 Final as per environmental standard) and battery backups supporting all electrical and mechanical systems.
- Compliance Certifications: No explicit data found yet about formal third-party compliance certifications (e.g. ISO, SOC, PCI, etc.) for Edged Phoenix at time of sources.
🌐 Connectivity & Carrier Access
- Fiber & Carriers: On-demand fiber providers are being brought into the facility. Light Source Communications has been announced as the first network provider to build into Edged Phoenix.
- Diverse Fiber Entry: Multiple fiber providers and at least four diverse points of entry are planned.
- Meet-Me / Interconnection Rooms: The facility includes meet-me rooms to facilitate interconnection.
- Carrier-Neutral Status: While specific “carrier-neutral” phrasing is not fully confirmed for all carriers, the facility is being set up for multiple providers and on-demand fiber, supporting diversity and ecosystem-rich interconnection.
💼 Who It Serves
- Hyperscale compute / AI model training and inference workloads, especially those needing very high rack density.
- Enterprises needing low latency and robust, sustainable digital infrastructure in the Southwest U.S.
- Organizations with strong sustainability goals (water conservation, energy efficiency).
- Customers requiring flexible connectivity options and carrier diversity.