Get Colocation Pricing Now! +1 833-471-7100

Keel Infrastructure: Leger / Sherbrooke Leger

Keel Infrastructure Leger / Sherbrooke Leger is located at 290 Rue Léger, Sherbrooke, Quebec J1L 1Y5, Canada. The gross building size for this location has not been provided. The gross colocation space is not available for this data center. No power information has been offered for this location. We found 13 data center locations within 50 miles of this facility. Certifications for this location include ISO 27001.

About Leger / Sherbrooke Leger

Keel Infrastructure Leger / Sherbrooke Leger in Sherbrooke, Québec is a high-density digital infrastructure site at 290 Rue Léger within Keel Infrastructure’s three-site Sherbrooke campus. The Leger site is part of a campus that also includes The Bunker at 360 Chemin Labonté and Garlock at 4228 Rue de la Garlock. Leger delivers 30 MW of total power capacity and supports bare metal, colocation-aligned deployments, and high-performance compute workloads in Québec’s Eastern Townships.

The Leger facility was developed under the former Bitfarms platform as a 30 MW cryptocurrency-mining and dense-compute site on Rue Léger in Sherbrooke. Production began with 16 MW online and a planned buildout to 30 MW, with electrical engineering covering the main 25 kV electrical entrance through final production-equipment connections. The broader Sherbrooke campus draws on 96 MW of contracted hydroelectric power supplied through Hydro-Sherbrooke, giving Leger a power-backed Québec infrastructure profile for continuous high-load computing.

Sherbrooke gives Leger a strategic Québec location with access to industrial zoning, cold-climate operating conditions, Montréal connectivity corridors, and renewable hydroelectric power. Keel Infrastructure’s current platform focuses on data centers and energy infrastructure for high-performance computing and AI workloads across Québec, Pennsylvania, and Washington. Within that platform, Leger provides a 30 MW Sherbrooke deployment point for dense server environments, AI infrastructure conversion, bare metal workloads, and Canadian compute capacity.

🏢 Facility Highlights

  1. Sherbrooke Campus Site: Leger is part of Keel’s Sherbrooke cluster with The Bunker and Garlock.
  2. Power Capacity: 30 MW of total power capacity.
  3. Facility Address: 290 Rue Léger, Sherbrooke, Québec J1L 1Y5.
  4. Compute Heritage: Built for dense cryptocurrency-mining infrastructure and positioned for HPC and AI workloads.

🌱 Sustainability & Energy

  1. Hydroelectric Supply: Sherbrooke campus capacity is supplied through Hydro-Sherbrooke.
  2. Québec Power Market: The facility operates in a province with a hydroelectric power profile.
  3. Cold Climate: Sherbrooke’s climate supports lower ambient-temperature operating conditions for dense compute.

🧠 AI Infrastructure

  1. HPC Platform: Keel Infrastructure develops power-backed data centers for HPC and AI workloads.
  2. High-Density Capacity: Leger’s 30 MW capacity supports dense compute planning.
  3. Campus Flexibility: Leger complements The Bunker and Garlock for phased Sherbrooke campus deployments.

🏭 Who It Serves

  1. High-Density Compute: Dense server, bare metal, and accelerator-oriented deployments.
  2. AI & HPC Users: Workloads requiring power-backed Canadian infrastructure.
  3. Colocation Buyers: Organizations evaluating Québec capacity for private infrastructure deployments.
  4. Canadian Compute Deployments: Teams requiring Québec-based infrastructure and regional data location.