Edged: Madrid-Getafe 1 Data Center
Edged Madrid-Getafe 1 Data Center is located at Calle Fundidores, 40, Getafe, Spain. The data center is 22 sqft. There is a total of 22 sqft in raised floor space for colocation. It has access to 20.0 MW of power. We found 78 data center locations within 50 miles of this facility. No certifications are specified for this location.
Colocation
About Madrid-Getafe 1 Data Center
Madrid-Getafe 1 Data Center is a state-of-the-art facility located at Calle Fundidores nº 40, Polígono Industrial Los Ángeles, Getafe, Madrid, Spain. It is operated by Edged Energy in partnership with Merlin Properties. Strategically positioned ~12–15 km south of central Madrid, it benefits from proximity to Spain’s political, commercial, and cloud infrastructure centers. The location lies in a major Spanish fibre and logistics corridor, with direct low-latency connections to undersea cable landings in Bilbao, Barcelona, and Lisbon. The facility is designed for high performance, sustainability, and AI-ready workloads.
⚙️ Facility Highlights
- Critical IT load capacity of 20 MW.
- Purpose-built space: over 22,900 m² of facility area.
- High rack power densities: up to 70 kW per rack with air cooling; up to 200 kW per rack via plug-and-play liquid cooling.
- Leading energy efficiency: average PUE (Power Usage Effectiveness) of ~1.15 portfolio-wide.
- Cooling systems: uses waterless cooling for certain sections (modular ThermalWorks systems), non-toxic glycol, low Global Warming Potential refrigerants (e.g. R1234ze or R515-B). Rooftop air-cooled chillers in some configurations.
- Zero water waste cooling design for facility areas.
- On-site battery storage: 40 MWh.
🔐 Security & Compliance
- Tier III standard design: concurrently maintainable infrastructure with N+1 redundancy for power, UPS and cooling systems.
- 100% uptime Service Level Agreement (SLA).
- Multilevel security zones with 24/7 access and monitoring.
- Fire detection & suppression: double-interlock pre-action mist systems, addressable smoke detectors with hot-aisle early detection.
- Use of standby generation systems with Tier 4 Final engines to minimize NOₓ and particulate emissions.
🌐 Connectivity & Carrier Access
- Carrier-neutral facility. A mix of global Tier-1 and regional providers available.
- Multiple fibre providers and three diverse fibre entry points.
- Direct low-latency connections to undersea cable landings in Bilbao, Barcelona, and Lisbon.
- Two Meet-Me Rooms (MMRs) onsite.
💼 Who It Serves
- Enterprises and organizations with high-performance computing and AI workloads needing high rack density (up to 200 kW/rack).
- Cloud providers, hyperscalers, and enterprises seeking sustainable and efficient colocation.
- Industries and businesses prioritizing low latency, global connectivity, especially those with operations or customers in Latin America, Africa, or across Europe.
- Organizations with strong environmental, ESG, or sustainability goals, given the facility’s renewable energy usage, efficiency, low water usage, and green credentials.
Contact Edged
Complete the form to get in direct contact with Edged.