Provident Data Centers: Grand Prairie Data Center

Provident Data Centers Grand Prairie Data Center is located at Grand Prairie, Texas, United States. The data center is 8500000 sqft. The gross colocation space is not available for this data center. It has access to 1800.0 MW of power. We found 257 data center locations within 50 miles of this facility. No certifications are specified for this location.
Colocation Facility
Colocation

About Grand Prairie Data Center

Provident Data Centers Grand Prairie Data Center Campus in Grand Prairie, Texas is a planned hyperscale development in the Dallas–Fort Worth Metroplex. The campus is designed for large-scale cloud, AI, HPC, and hyperscale infrastructure users that need powered land, build-to-suit capacity, and multi-phase expansion in North Texas. Provident lists the project at 810 acres, 8.5 million developable square feet, 26 planned two-story buildings, and 1.8 GW of total power.

The Grand Prairie campus is under active design and engineering, with the site fully rezoned and permitted. Provident’s current campus page lists Phase 1 delivery for Q1 2027, while the project announcement states the first building is scheduled to be energized in May 2026. The development is structured across multiple phases, with Phase 1 and Phase 2 each planned for 10 buildings and later phases planned for four additional buildings.

The campus is being developed by Provident Data Centers with PowerHouse Data Centers. The announced joint development includes a 1.8 GW switchyard, with the first 500 MW tranche approved through ERCOT. The site is positioned between Dallas and Fort Worth, just outside Grand Prairie in northern Ellis County, giving hyperscale users access to one of the country’s most active cloud, AI, logistics, and enterprise infrastructure markets.

🏢 Facility Highlights

  1. Campus Size: 810 acres.
  2. Developable Area: 8.5 million developable sq ft.
  3. Planned Buildings: 26 total two-story buildings.
  4. Power Capacity: 1.8 GW.
  5. Phase 1: 10 buildings.
  6. Phase 2: 10 buildings.
  7. Later Phases: 4 buildings listed across Phases 3 and 4.
  8. Development Status: Fully rezoned, permitted, and under active design and engineering.

🧠 AI Infrastructure

  1. Target Workloads: Hyperscale cloud, AI, and HPC deployments.
  2. Power Scale: 1.8 GW campus plan with a 500 MW ERCOT-approved first tranche.
  3. Build-To-Suit Model: Designed for large users requiring powered land and scalable campus capacity.
  4. High-Density Planning: Provident positions the campus for next-generation AI and high-performance computing requirements.

🛰️ Network Position

  1. Metroplex Location: Positioned between Dallas and Fort Worth.
  2. Regional Market: Serves the Dallas–Fort Worth data center market.
  3. County Position: Located just outside Grand Prairie in northern Ellis County.
  4. Airport Access: Near Dallas Fort Worth International Airport.

🏗️ Recent Expansions

  1. Announcement: Provident and PowerHouse announced the Grand Prairie hyperscale campus in February 2025.
  2. Power Milestone: First 500 MW tranche approved through ERCOT.
  3. First Energization: First building scheduled for May 2026 energization.
  4. Phase 1 Delivery: Provident’s campus page lists Q1 2027 delivery for Phase 1.